Maintenance + shutdown retrofit.
Service contracts on installed base. Shutdown retrofit within the shutdown window. Modernisation of plant without new build. For semiconductor fabs this means tool hookup during the scheduled maintenance window - for pharma it means HVAC Annex 1 adaptation in a live line - for automotive paint shops it means summer shutdown with 6-week mobilisation.
What we service continuously.
- Service contracts on cleanroom and HVAC installations
- Scheduled filter changes HEPA / ULPA / pre-filters
- Annual pressure cascade validation
- AHU cleaning and inspection
- Repairs and spare parts logistics
- Emergency mobilisation on plant failure
What we retrofit during turnaround.
- HVAC upgrade (filtration, airflow, heat recovery)
- GMP Annex 1 compliance in existing installations
- Cleanroom class upgrade (e.g. ISO 7 to ISO 6)
- Tool hookup in semiconductor applications
- Paint shop modernisation (e-mobility conversion)
- Decommissioning and deinstallation for plant repurposing
How we hold the shutdown window.
On the plant side, the shutdown is sacrosanct: the facility KPI is tool uptime, not construction convenience. Our mobilisation logic is calibrated to that reality - named site management per shift, headcount plan by day, pre-fabricated sub-assemblies, FOD inspection protocol before recommissioning.
Request shutdown capability sheet.
Mobilisation lead times, crew model for 14-day shutdowns, FOD statistics from 15+ years of live-fab work.